home *** CD-ROM | disk | FTP | other *** search
/ Skunkware 5 / Skunkware 5.iso / tls / tls029.1.Z / tls029.1 / industry / 245 < prev    next >
Encoding:
Text File  |  1994-04-19  |  972 b   |  22 lines

  1. FOREFRONT Construction Management Sys./Job Cost - Dexter & Chaney, Inc.
  2.  
  3. KEYWORDS: job costing, accounting, construction, 4GL, Construction and Contracting            , 206     
  4.  
  5. The FOREFRONT Construction Management Job Cost system enables the contractor to
  6. manage the costs of labor, material, equipment, and sub-contracted costs for
  7. each construction job. The system allows for unlimited cost types within a job,
  8. allows job and phase inquiry for reviewing projected cost to complete and
  9. detail transactions immediately on the screen, and permits completion
  10. percentages to be entered or calculated automatically. The system verifies
  11. input data and allows transaction entries to be edited and corrected prior to
  12. posting. The system creates audit trails for accounting purposes, and posting
  13. programs automatically produce journals.
  14.  
  15.  
  16. Dexter & Chaney, Inc.
  17. Tel: (206) 364-1400
  18. Toll free: (800) 875-1400           
  19. Fax: (206) 367-9613
  20. Brad Mathews
  21. Dir., Sales and Marketing
  22.